THINKING,
SELF-IMPROVING,
CREATIVE, THAT EMPLOYEE WILL SUCCEED
A Believing Creation ...

ANKA PROJECT ENGINEERING

 this is our job ..       

Arrow Down

SERVICES

Construction Plans
Architectural Modelling
Construction Site

Offer Preparation
Consultancy

As a result of all the studies and R&D studies of the requested job, the customer satisfaction-oriented current material and labor costs are taken into consideration, and the offer and consultancy service is carefully prepared.

Design
Projecting

Following the signing of the contract, the project design and manufacturing preparation phase begins. The entire project design process is completed by using three-dimensional advanced technical drawing programs. The static calculation report of the system can also be given in line with the customer's request. After the project is completed, the production starts with the approval of the customer.

Manufacturing Assembly
Quality Control

Each stage of production proceeds in a controlled manner and corrections are made by making interim assembly in order to be able to intervene immediately in the malfunctions that may arise.Finally, the entire system is assembled and customer approval is obtained and the delivery is made within a record and then packaging and shipment processes are started.

 
 

ABOUT US

Since 1982; I have worked with various companies in the private sector on steel, mechanical design & design, production planning, manufacturing, business follow-up, quality control and ISO 9000 quality management system and applications and gained valuable experience. As ANKA Project Engineering Consultancy Manufacturing Import Trade and Industry company, we would like to share my experiences with you and to be a solution partner with you. As in the works we have done so far, we aim to continue our work in a strong and dynamic manner in our future works and to bring customer satisfaction, which is one of our missions, to the highest level.

2020

Year of Establishment

 

81

Completed Projects

 

-

Ongoing Projects

 

-

Awards Won

 

 

PROJECTS

Highway tunnel intermediate transition tunnel formwork

Safety barrier mold

240 m3 / hour Concrete plant

380 m antenna pole assembly area

100 m antenna mast

Highway tunnel Outer panel and flute mold

Title pattern

Factory, facility placement and project planning

380 m Antenna mast

Column mold

Transition shoring

Water intake structure zurna formwork

Culvert formwork

Bridge foot formwork

Column formwork

Transition pattern

U-Channel formwork

Bridge foot formwork

Highway tunnel formwork

Bridge foot formwork

Industrial facility design & project planning

Blacksmith's car

Beam formwork

Pushing formwork

Block formwork

3-way pole foot Bridge foot formwork

Bridge foot formwork

REFERENCES

  • ZNP UKOSB / 13.6 MWe BIOMASS COMBUSTION PLANT WASTE CHIMNEY PROJECT & MANUFACTURING

  • MASLAK PERFORMANCE CENTER STEEL CONSTRUCTION RENOVATION PROJECTS

  • SENTEPE ATV 100 m ANTENNA POLE DESIGNS

  • LEBANON ENERGY TRANSMISSION LINE POLES DESIGN

  • DESIGN AND PROJECT OF STADIUM LIGHTING POLES

  • RADAR TOWER MANUFACTURING DETAILS

  • BLACK SEA EREGLI IRON AND STEEL FACTORIES RENOVATION PROJECTS

  • BELT CONVEYOR AND TRANSFER TOWER PROJECTS

  • METRO, HIGHWAY AND WATER TUNNEL MOLD PROJECTS

  • BEAM, FOOT, COLUMN, GRILL AND PRECAST MOLD PROJECTS

  • FACTORY SITE AND OTHER INDUSTRIAL DESIGNS

  • CONSTRUCTION MACHINERY R & D STUDIES

  • CEMENT FACTORIES RENOVATION PROJECTS

 

Türkçe

brosur.png

English

brosur_en.png
 
 

CONTACT

Contact us

For questions or suggestions, please

fill the form below

www.ankaproje.com

info@ankaproje.com

Center office

Yücel Ergen

General manager

​​Tel: +90 530

Get a quote : +90 530

Factory

  • LinkedIn Sosyal Simge
  • Facebook
  • Twitter
  • Instagram
  • Pinterest
  • YouTube